Sunday, April 6, 2008
Frog Day
Friday, April 4, 2008
Finished Objects!
I used grosgrain ribbon on the Tangled Yoke button flap to make the buttons more likely to stay on and not damage the knitting. It could really use ribbon on the buttonhole side, but I'm not sure I'll be able to psych myself up for all the measuring and sewing involved. It's a bit snug on me, which would be fine if the buttons would stay closed, but it looks better on DD.
I ended up using an odd skein of Silk Garden to edge the rib warmer instead of my Einstein Kureyon. The pattern called for 5 inches of kniting under each arm before turning to go up the fronts. I thought that sounded like too much and only knit 4 inches, but I wish I'd knit only about 2 'cause the arm holes are a little big. I wasn't sure what effect decreasing rows there would have on the whole entity, never having seen one of these in the flesh before. I figured this would be a test run. I've ordered a leaflet from Schoolhouse Press with other options. I have to say that I do like this versions method of doing the back in one piece (not being a fan of seaming in general and seaming garter in particular!)
And I've started something new - the Anne Shoulder Scarf only in Smooshy instead of Anne. Love the color - it's called Good Luck Jade. This was souvenier yarn - from Island Knits in Pawley's Island, SC. Spring break was good knitting/reading/watching movie weather.
A little stash enhancement -
Donegal Tweed from Orchardside and Araucania Naturewool from Yarnela (eBay.) Probably the tweed for a vest - no idea on the Araucania. It may be my favorite yarn ever and I am hoarding it. I have eggplant, brick, tan, blue-green, and a few odd skeins of light blue and brown. I want more.
Friday, March 21, 2008
Re-evaluating 3 months in
- Shawl-collared vest (new) COMPLETE
- Fix DH's sweater (needs to be lengthened) DONE
- Finish Tangled Yoke (needs buttons and underarm seams) Underarms done
- Toggles on CPH
- Finish (???) Malabrigo sweater (UFO - just needs sleeves and neckband)
- Finish Silky Wool sweater (UFO - I think it just needs sleeves)
- Finish Cotton Patine top (UFO - seam and knit edging for armholes)
- Bird's Nest shawl (UFO - maybe 25% completed)
- Heartland shawl (UFO - maybe 15% completed)
- Lamb's Pride cardigan (finish or rip - needs sleeves, seaming)
- Einstein coat (UFO - about 20% completed) Now over half-way done
- Celtic Knot (UFO - about 30% complete)
I guess that's not too bad for less than 3 months work. I have started another project - a version of Elizabeth Zimmerman's Rib Warmer Vest that was in an old issue of Knitters Magazine. I'm nearly halfway done with that. I was wearing the Shawl-collared vest so much I figured I must need another vest! I'm using some Bartlett 2-ply I got on eBay years ago. It's a pretty Bronze color. It's been hanging out in the work basket with the Noro Einstein coat and they look so nice together that I may use some of that Noro for the i-cord edging.
I've modified the Einstein design by knitting the body in one piece for a few inches to avoid having batwing sleeves. I'm pretty much flying by the seat of my pants with this one, making it up as I go along. As you can tell from my past history, I'm not put off by the idea of ripping it out if it doesn't work.
Speaking of ripping out - I'm leaning that way on the Malabrigo sweater. I love the yarn and the sweater is just not living up to expectations. Someone at my knitting group was telling me of a way to alternate yarns when knitting in the round. I may start over trying that. I've pulled out the Celtic knot pullover and Lamb's Pride cabled cardigan, but no decisions yet on their fates.
Saturday, February 23, 2008
Progress Report
That's 2 down, 10 to go. I don't know if I'll be able to tackle the seaming of the Tangled Yoke in the next week - it's looking pretty hectic and I need to be able to slow down and concentrate. I'm thinking this will be the plan when I do get around to it:
- Seam underarms
- Block
- Darn in ends
- Sew grosgrain ribbon on button placket
- Sew buttons
- Wear it!
Still wearing the vest everyday. I've gotten lots of compliments on it.
I have to decide if I'm going to frog the Malabrigo sweater before I knit any more on the sleeves. Need to slow down and concentrate for that too. My best bet at this point is probably to pick up the Not-so-warm Einstein. Everything else just takes too much thinking for my poor overloaded brain.
Wednesday, February 20, 2008
What did I wear before I finished this vest?
I've ripped out the ribbing on Husband's sweater and knit most of the additional stockinette. I inadvertently picked up 6's instead of 7's and didn't realize it until I noticed a definite ridge where I started knitting again. By then I'd knit too much to rip out, so I'm hoping that blocking will disguise the ridge and that the tighter gauge will work okay since DH's hips are smaller than his tummy!
Sunday, February 17, 2008
Nearly done
Tuesday, February 12, 2008
Progress report
I hope I can make it to our knit group tonight. I haven't been in ages because of scheduling conflicts. I think we will have some new people that found out about us on Ravelry.